On a typical single-family house, a roof replacement takes a day or two on the roof. That’s the range IKO, the shingle maker, gives for a home’s asphalt shingle roof from start to finish. Your roof can run longer. The size and pitch, the layers coming off, the deck under them and the weather off Georgian Bay all move the count. You can settle the first two before the quote: the size and pitch from the driveway, the layers from the paperwork. The deck stays hidden until the old shingles are off.

Questions about your own roof? Call Adem at (705) 770-0636.

What happens in those days

A roof replacement is done in a set order, from the deck up. The old roof comes off one section at a time. The deck gets checked, and soft plywood is replaced. Then the new roofing system goes on and the site is cleaned up. Our roof replacement page walks through each step.

The same source breaks the numbers down. On an average-sized roof, it says tear-off can wrap up in a single day. It puts the installation at one or two days. The two overlap, because a crew can strip a section and cover it before it moves on. That’s why the total is still a day or two and not three.

What you can count before the quote

Two of the four things that set the time can be known before tear-off.

Size and shape. Square footage is perhaps the biggest factor. A bigger roof takes longer. A steep roof is slower too. Every valley, dormer, chimney, skylight and plumbing vent needs flashing, and flashing takes time. A plain two-slope roof over a bungalow is a short job. A two-storey house with dormers and a chimney on a steep pitch is not.

Layers. Two old layers mean more to strip and haul away than one. If someone laid new shingles over old ones years ago, all of it comes off. We do a full tear-off on every replacement, so the count includes every layer that’s up there.

You can’t see the layers from the lawn, but you can ask. The seller’s disclosure, an old invoice or the last roofer’s paperwork may say whether the roof was ever shingled over.

Factor When you can know it What it does to the day count
Size and pitch From the driveway A bigger or steeper roof takes longer
Layers From the paperwork More layers mean more to strip
Deck At tear-off Soft plywood adds work
Weather From the forecast Rain and snow days push the finish back

What only tear-off shows

The deck is the one part nobody can count ahead of time. It sits under the shingles and the underlayment, and from the ground it looks the same whether it’s sound or soft. Damaged plywood often shows only after tear-off.

When the crew finds it, the rotten sheets are cut out and new plywood goes down before the new roof goes on. A few sheets is a small part of the day. A whole deck is a much bigger job. Our page on roof plywood replacement shows how that part works.

You can get a hint first. Go to the attic hatch on a bright day with a flashlight. Don’t walk out onto the joists. Look at the underside of the plywood near the eaves, where ice dams back water up under the shingles. Dark or flaking wood is worth naming to whoever quotes the job. It won’t give you a number, but it tells both of you where to look.

Tear-off can also turn up work beside the deck: a ridge vent to replace, attic insulation to top up, framing to add. Each is more work done while the roof is open. If the attic runs hot or you see big icicles every winter, ask about attic insulation and ventilation at the quote visit, before the start date.

The days the crew doesn’t go up

The calendar count and the working count aren’t the same. Roofers should not be on a roof in rain or snow. A two-day job that starts before a wet week can finish several days after it began.

Lake-effect snow off Georgian Bay is the local version of that problem, from Wasaga Beach to Collingwood. A stripped section can’t sit open under falling snow. On those days the weather decides, not the plan.

Then there’s the part that keeps going after the crew leaves. Asphalt shingles have a strip of sealant that bonds them to the row below in the sun. Owens Corning says shingles installed in cold weather may take longer to seal and may need hand sealing. The job is done in days. In late fall, the seal can wait for spring. Our post on the best season for roof replacement covers how to pick a start date around it.

We do replace roofs in winter, when an old roof is too far gone to repair. Shingles don’t seal fully in the cold, so it’s a job done because it has to be done, not because winter is a good time.

Cottage roofs with nobody home

Nobody may be at the cottage while the roof is done. A cottage heated only on weekends can get ice dams at the eaves, where meltwater backs up under the shingles and soaks the plywood. That makes the eave plywood the likely extra work on a cottage roof. Ask at the quote visit how extra plywood is handled, and make sure someone can be reached by phone on the day.

Questions homeowners ask about timing

Is it normal for a roof replacement to take more than a day?

Yes. A shingle maker’s published timeline says tear-off can wrap up in a single day on an average-sized roof, and puts the installation at one or two days. A bigger or steeper roof runs longer. A deck that needs new plywood adds time as well.

Do I have to leave home while the roof is replaced?

No. It’s loud and busy, but you don’t have to leave. Move the cars out of the driveway first. Inside, take fragile things off the upstairs walls.

What month is best for a new roof?

A warm, sunny stretch in summer or early fall suits a new roof best, because the sun can bond the shingles. Our guide to the best season for roof replacement covers how to pick a start date.

Can a roof replacement be done in winter?

Yes, when the old roof can’t wait. The crew loses the icy and snowy days, and the shingles may not seal until it warms up. If the old roof is the question, read how long you can delay roof replacement.

The one thing this post can’t count

We can’t see your deck from here, and neither can you from the lawn. The size, the pitch and the layers can be counted before the quote. The plywood under them is settled the day the old shingles come off. That count starts with a roof inspection. Call (705) 770-0636. We serve Wasaga Beach, Collingwood, Stayner, Barrie and Simcoe County.